Headers and Tracks

BERTHA headers and tracks are the mounting system for hurricane storm panels. Panels can be direct mounted — bolted straight into the wall with panel mates and anchors — or installed into a track system, which makes taking panels down and putting them back up much faster season to season. Tracks are extruded aluminum, can be cut to length, and are available for both 2" and 2-1/4" panels. Use the tables below to identify the parts your opening needs.

Top track — above the opening

Headers are panel-depth specific. A 2" panel needs a 2" header; a 2-1/4" panel needs a 2-1/4" header.

PartMounts toPanel depthFinishes
2" BERTHA "H" Header Wall above the opening 2" White, Bronze
2.25" BERTHA "H" Header Wall above the opening 2-1/4" White, Bronze
2" BERTHA "U" Header Ceiling or soffit above the opening 2" White, Bronze
2.25" BERTHA "U" Header Ceiling or soffit above the opening 2-1/4" White, Bronze

Choose an "H" header when you are fastening into the wall above the window, and a "U" header when the panel needs to attach to a ceiling, soffit, or overhang instead.

Bottom track — below the opening

Bottom tracks fit both 2" and 2-1/4" panels. The choice is between studded angles, where the panel drops over studs and is secured with wingnuts, and studless "F" tracks, which use F-Track Bolts.

PartInstalls intoFasteningFinishes
BERTHA Studded Angle, studs every 6" on center Wall or ground below the opening Studs and wingnuts Mill, White, Bronze
Low Profile BERTHA Studded Angle Wall below the opening Studs and wingnuts White
BERTHA Reverse Studded Angle Wall or ground below the opening, reversed orientation Studs and wingnuts White, Bronze
BERTHA "F" Track Studless Angle Wall or ground below the opening F-Track Bolts White, Bronze
BERTHA Reverse "F" Track Studless Angle Ground below the opening, reversed orientation F-Track Bolts White
BERTHA Studless "F" Track, 4 build-out sizes Wall, with build-out clearance F-Track Bolts White, Bronze

The Low Profile Studded Angle sits closer to the wall than the standard studded angle when appearance matters. All angles and tracks can be cut to length.

Build-out distance

"H" Headers and the Studless "F" Track are ordered with a build-out of none, 1", 2", or 3". Build-out moves the track away from the wall so panels clear obstructions around the opening, such as trim and moldings. If your opening has an obstruction and you are not sure which build-out size clears it, contact us before ordering.

What length track do I need? Use the coverage chart

The coverage chart tells you two things at once: how many panels cover your opening, and how long to cut the mounting track that holds them.

How to use it. Measure the width of your opening. Find where that measurement falls in the Total Panel Coverage column and round up to the next value. Read left for the number of panels you need, and read right for the track length.

Working example. Let's say your window is 47" wide. Start in the middle column of the coverage chart below, and notice that 47" falls between 43.125" and 49.375", so round up to 49.375". Looking left, the first column indicates we need 4 panels. Reading to the right, those 4 panels nested together need a mounting track cut at 50.375" for 2" panels, or 51" for 2-1/4" panels.

2 inch and 2-1/4 inch storm panel coverage charts showing number of panels, total panel coverage, and mounting track cut length

# of PanelsTotal Panel CoverageCut 2" Track AtCut 2-1/4" Track At
1 13.375" 14.375" 15"
1-1/2 19.250" 20.375" 21"
2 25.375" 26.375" 27"
2-1/2 31.250" 32.375" 33"
3 37.250" 38.375" 39"
3-1/2 43.125" 44.375" 45"
4 49.375" 50.375" 51"
4-1/2 55.250" 56.375" 57"
5 61.000" 62.375" 63"
5-1/2 67.000" 68.375" 69"
6 72.750" 74.375" 75"

In the chart above, 4.5 means 4 full panels and 1 half panel for example. Half-panel counts are available where a full panel would overshoot the opening. Always round up — never down.

Installation Reference

Bertha Storm Panel Installation and Specification Guide (PDF) — manufacturer reference covering "H" header and studded angle mounting, panel installation sequence, fastener and drill charts for wood and concrete construction, required tools, and storage and maintenance.

This document is a manufacturer reference only. Installation requirements vary by jurisdiction. All shutters, headers, tracks, and hardware must be installed in accordance with your local building code and the applicable Product Approval. Verify all requirements with your local building department before installing.